| Foundation |
|
Precast Reinforced Concrete piles and/or other approved foundation system complying with SS CP4 |
Sub-structure & Super-structure |
|
Reinforced concrete and/or post tensioned concrete structure complying with SS CP65 |
Roof |
|
Reinforced concrete and/or post tensioned concrete structure flat roof with appropriate waterproofing system |
Floor Loading Capacities |
|
1st storey (Warehouse) : 10.0 kN/m2
1st storey (Canteen) : 5.0 kN/m2
2nd & 3rd storey (Warehouse & Factory): 7.5 kN/m2
4th storey (Carpark) : 5.0 kN/m2
5th to 11th storey (Factory & Private Open Terrace) : 5.0 kN/m2
Flat Roof : 2.5 kN/m2
All Ramps : 5.0 kN/m2 |
Structure Floor-to-Floor Height |
|
1st storey : 6.00 metres
2nd & 3rd storey : 4.50 metres
4th storey : 3.40 metres
5th to 8th storey : 3.60 metres
9th to 11th storey : 3.90 metres
|
Window |
|
Aluminium frames with tinted glass window |
Doors |
|
Timber door with lock set to Factory and Warehouse units
PVC door with lock set to toilets
|
External Walls |
|
Reinforced concrete and/or clay brick with cement and sand rendering and emulsion paint finish |
Ceiling |
|
Concrete finish with paint to all units |
| Internal Wall Finishes |
|
Cement and sand plaster and/or skim coat with paint finish
Tiles and/or cement and sand plaster and/or skim coat with paint finish to lift lobbies
Tiles and/or cement and sand plaster with paint finish to toilets
|
Floor Finishes |
|
Powder float and/or screed finish to Factory and Warehouse units
Tiles and/or powder float and/or screed finish to lift lobbies
Ceramic tiles to toilets
|
Lifts |
|
2 passenger lifts and 2 passenger cum fireman lifts |
| Electrical |
|
Emergency lighting including exit signs to all units provided in compliance with statutory requirements
40A 3 Phase Power Supply to meter compartment for factory units |
Type C1a, C2a, C1 to C6 on 5th storey
Type D1a, D1 to D5 on 6th storey
Type E1a, E1 to E5 from 7th to 10th storey
|
60A 3 Phase Power Supply to meter compartment for warehouse units |
Type A1 and B1 from 1st to 3rd storey |
100A 3 Phase Power Supply to meter compartment for factory units |
Type B4 and B5 on 2nd & 3rd storey
Type E6 to E11 on 10th and 11th storey
|
100A 3 Phase Power Supply to meter compartment for warehouse units |
Type A2 to A5 on 1st storey
Type B2 and B3 on 2nd & 3rd storey
|
200A 3 Phase Power Supply |
Canteen |
|
| Telecommunication Services |
|
Telephone block terminal and pre-wired telephone cable provided from telephone riser to telephone block terminal in each Factory/Warehouse unit to facilitate telephone connection upon application by purchasers |
| Master Antenna System (MATV) |
|
MATV tap-off box is provided in each Factory/Warehouse unit |
Fire Protection |
|
Fire protection system provided in compliance with statutory requirements |
Sanitary & Plumbing Installation |
|
Sanitary and plumbing system provided in compliance with statutory requirements |
| Mechanical Ventilation |
|
Mechanical ventilation (where natural ventilation is not possible) will be provided in compliance with statutory requirements to designated areas only |
| Communication System |
|
Communication system provided in compliance with statutory requirements |
Lighting Protection |
|
Lighting protection system provided in accordance with statutory requirements |
Project Information |
|
Zoning : Business 1
Tenure of Land : 60 years leasehold w.e.f. 31 December 2008
Lot/Mukim : Lot No. 06617P of Mukim 23
Planning Approval No : P140509-0213-Z000 dated 12 October 2009, P140509-0213-A021 dated 29 October 2010
Building Plan No: A1409-00004-2009-BP01 dated 3 December 2009
Expected T.O.P Date : 31 December 2011
Expected Date of Legal Completion : 31 December 2014
|
| |
|
|
| Contact |
|
For
more information, please contact: |
| |
|
David Ang
Handphone: 9791 6225
email: david.ang@orangetee.com
Daniel Tan
Handphone: 9455 9111
email: daniel.tan@orangetee.com |