FOUNDATION
Prestressed spun concrere piles.
Back To Top
SUPERSTRUCTURE
Reinforced concrete using Grade 35 concrete (manufactured from Portland Cement)
complying with 5526 and steel reinforcement and welded steel fabric
complying with SS2 and SS32 respectively.
Back To Top
WAllS
External - Common Brick & / or Reinforced Concrete & / or Precast Panel
Internal - Common Brick / Block Wall
Back To Top
ROOF
Reinforced concrete flat roof to be finished with waterproofing and insulation system.
Back To Top
FINISHES
A) Wall
Wall (For Apartments)
- Marble* for Masterbath and Powder Room
(up to false ceiling height and on exposed surface only).
- Ceramic tiles for Bath 2 and Bath 3
(up to frieze and on exposed surface only), cement and sand plaster with
emulsion paint above frieze in Bath 2 and Bath 3.
- Ceramic tiles to Kitchen (no tiles behind Kitchen cabinet).
- Cement and sand plaster with emulsion paint to other areas.
- Skim coat / cement and sand plaster with textured paint to exterior,
Balcony, Private Enclosed Space and Roof Terrace.
Wall (For Common Areas)
- Natural stone / ceramic tiles finish and cement and sand plaster
with emulsion paint to Lift Lobbies at lst storey and Basement.
- Ceramic tiles, cement and sand plaster with emulsion paint to
Typical Lift Lobbies
B) Floor
Floor (For Apartments)
- Marble* with timber skirting to Living, Dining and Store
(where access is from Living / Dining).
- Marble* ro Masterbath and Powder Room.
- Ceramic tiles to Bath 2, Bath 3, Toilet, Kirthen, Utility,
Yard and Store (where access is from Yard).
- Timber parquet with skirting to Bedrooms and Study.
- Ceramic tiles / homogeneous tiles to Balcony, Roof Terrace
and PES at 1st storey.
Floor (For Common Areas)
- Marble* / granite / ceramic tiles to Lift Lobbies at 1st storey
and Basement.
- Ceramic tiles to Typical Lifr Lobbies and Corridor.
- Cement / sand screed to escape staircases.
C) Ceiling
Ceiling (For Apartments)
- Moisture resistance ceiling board to all barhrooms.
- Fibrous plasterboard for Kitchen.
- Skim coar / fibrous plaster board wirh emulsion paint to
other areas (where applicable).
Back To Top
WINDOWS
Powder coated aluminium framed windows with 6mm tinted float glass.
Powder coated aluminium framed windows with 6mm tinted obscured
glass at Toilet where required.
Back To Top
DOORS
· Solid timber door to main entrance.
· Timber flush door to all internal doors.
· Powder coated aluminium framed sliding and /
or swing door with 6mm tinted glass float to Living / Dining / Masrer
Bedroom / Bedroom where applicable.
· PVC folding / sliding door to Yard Toilet and Utility.
· Timber louvred door to store.
Back To Top
IRONMONGERY
Selected quality locksets to all doors
Back To Top
|
SANITARY FITTINGS
| Master bathroom |
1 long bath complete with bath mixer
1 vanity top with under counter basin and basin mixer
1 shower cubicle complete with shower mixer and shower set
1 pedestal water closet
1 soap / sponge holder
1 soap holder
1 mirror
1 paper holder
1 towel rail
|
|
| Powder Room |
1 vanity top with under counter basin and basin mixer
1 pedestal water closet
1 mirror
1 paper holder
1 towel rail
|
|
| Bathroom 2 & 3 |
1 vanity top with under counter basin and basin mixer
1 shower cubicle with shower mixer and shower set
1 pedestal water closet
1 mirror
1 soap holder
1 paper holder
1 towel rail
|
|
| W.C. |
1 wall hung basin with tap
1 shower tap and shower set
1 pedestal water closet
1 soap holder
1 paper holder
|
|
| Yard |
1 bib tap |
|
| Roof Terrace |
1 bib tap |
|
| Private Enclosed Space |
1 bib tap |
Back To Top
|
ELECTRICAL INSTALLATION
Wiring for lighting and power points shall be in concealed conduit
where possible except for areas with false ceiling where
wiring above false ceiling shall be in exposed / concealed conduit.
Exposed rrunking and concealed conduir (where necessary)
in Yard, Utility, Store and WC.
Refer to Electrical Schedule for details.
Back To Top
TV /TELEPHONE
Adequate provision of TV/Telephone points.
All TV points are cable ready.
(Note: Purchasers are liable to pay annual fee, subscription fee
and such other fees to the Singapore Cablevision Pte Ltd (SCV) and/or
any other relevant authorities. The Developer is not responsible to make
arrangements with SCV for the service connection to the individual
apartments)
Back To Top
LIGHTNING PROTECTION
Lightning protection system provided in accordance with Singapore
Standard CP33:1996.
Back To Top
PAINTING
- Emulsion paint to internal walls.
- Emulsion paint to external walls.
Back To Top
WATERPROOFING
Waterproofing to floors of kitchen, bathrooms, yard, balcony and roof terrace.
Back To Top
DRIVEWAYS & CARPARK
-Natural stone pavior / interlocking paver / premix to surface
driveway and carpark.
- Concrete floor with hardener to Basement Driveway and Carpark.
Back To Top
RECREATIONAL FACILITIES
- Swimming Pool and Wading Pool
- Clubhouse with Multi-Purpose Room
- Jacuzzi
- Changing Rooms with Sauna Rooms
- Children's Playground
- Gymnasium Room
- Barbecue Pits
- Water Features with Rock Gardens
- Fitness Corner
- 2 Tennis Courts
Other Facilities
- Management Office
Back To Top
Turfing
- Cow grass
Back To Top
ADDITIONAL ITEMS
- Kitchen cabinets / appliances: High and low laminated Kitchen
cabinets with granite worktop, sink, oven, hood and hob.
- Air-conditioning: Wall mounted split air-conditioning to Living
and Dining Rooms, Bedrooms and Study.
- Audio intercom provided at 1st storey and Basement Lift Lobbies
for communication with all apartment units.
- Hot water supply to Masterbath, Powder Room, Bath 2 and Bath 3.
- Built-in wardrobe to all Bedrooms except Study.
Back To Top
|
NOTES
* Marbles and granites are natural stone materials containing veins with tonality
differences. There will be colour and markings caused by their complex mineral
composition and incorporated impurities While such materials can be pre-selected
before installation, this non-conformity cannot be totally avoided.
** Air-conditioning system has to be maintained and cleaned on a regular basis by
the Purchaser. This includes the cleaning of filters and clearing the condensate
pipes to ensure good working condition of the system.
Back To Top
|
 |
|
Developer: Anchor Developments Pte Ltd
Legal Description: Lot 3375X & 3377C of Mukim 10
Tenure of land: Estate in perpetuity
Developer's Licence No.: B1387
Building Plan No.: A0781-003-1997-BP01 dated 27 August 1999 /
A0781-003-1997-BP02 dated 20 October 1999 /
A0781-003-1997-BP03 dated 6 November 1999 /
A0781-003-1997-BP04 dated 6 March 2000
Expected Date of TOP: 31 December 2002
Expected Date of Legal Completion: 31 December 2005
Back To Top
|
While every reasonable care has been taken in preparing this brochure, the
developer and its agents cannot be held responsible for any inaccuracies.
All statements are believed to be correct but are not to be regarded
as statements or representations of fact. All information and
specifications are current at the time of going to press and are
subject to change as may be required and cannot form part of the contract.
All plans are subject to any ammendments approved or may be approved
by the relevant authority. Renderings and illustrations are artist's
impression only and photographs are only decor suggestions and none can
be regarded as representation of fact. Floor areas are approximate
measurements and subject to final survey.
|
|