OrangeTee.com
PROJECT LAUNCHES
Century Warehouse
 
A Step Ahead In Business.

Century Warehouse is a modern premium class industrial development ideally located at 100E Pasir Panjang Road, well within Singapore's established industrial belt. Towering 8 floors, the top 7 levels are well suited for operational space and warehousing needs of industry and business concerns. The spacious ground floor is creatively designed to provide flexibility for showroom usage. Every effort has been made to ensure that tenants are offered a highly conducive and comfortable working environment in which peak performance and efficiency will be achieved. Century Warehouse has the added advantage of the established Developer's quality assurance and support. Besides, it is a nucleus of skills, manufacturing and logistic support all converged at one location, a one-stop solution for tomorrow's business needs.


Free DHTML scripts provided by Dynamic Drive

Crossroads of Industry

A combination of prime location and excellent infrastructural support, Century Warehouse is strategically located within Pasir Panjang industrial estate and directly across the road from PSA wharf, an area designated for future expansion as a commercial, industrial and leisure hub. The immediate surroundings include ancillary amenities such as eating establishments, offices and industrial complexes.

It is also conveniently linked to a network of major roads and expressways such as the PIE, AYE, ECP and CTE. This modern development is within cloase proximity to the Port, Business Parks, Central Business District, World Trade Centre and Jurong Industrial Estate.

The Easy access to public transport and the convenience of the up and coming proposed MRT at World Trade Centre, more than adequately cover the needs of commuters providing a potentially large labour pool from the surrounding housing estates. In high demand, Century Warehouse is a choice landmark for meeting today's industrial needs.

Space Functionality & Features

Every aspect of the building is meticulously planned for space functionality and efficiency.

The modern aesthetics of the premises is achieved with high building specifications to provide optimal flexibility and operational ease in clean, pollution-free surroundings to enhance your corporate image.

Acknowledge the demands of tenants for a stable, uninterrupted and vibration-free environment, the floor capacity of the building has been strengthened to 15kN/m² with the 1st storey capable of bearing up to 20 kN/m². Vehicular layout further segregates container traffic and private cars for uninterrupted movement of goods and people. Served by separate passenger and cargo lifts, other distinct features include covered loading and unloading bays, ample surface and basement carparking, automatic fire alarm and sprinkler systems and other infrastructural support and services, giving your business a competitive edge to get ahead of the competition.

click here to view cross-section plan
click here to view 1st storey plan
click here to view 2nd, 4th - 7th storey plan
click here to view 3rd storey plan
click here to view 8th storey plan

click to see enlarged image

The Map

Features and Facilities
Automatic carpark barrier with card access system at entrance of building
Ample carparking
10 surface lorry parking lots
12 surface carparking lots
24 basement carparking lots
1 passenger lift of speed 90m/min (with 15 persons capacity)
2 cargo lifts of speed 45m/min (with 3,000 kg capacity each)
Lift car size: 2.5m(W) x 3m(D) x 2.6m(H)
Lift door size: 2.1m(W) x 2.5m(H)
3 loadingand unloading bays
3 docklevellers (with 11,000 kg capacity each)
Floor loading
1st storey: ~20 KN/m²
2nd - 8th storey: ~15 KN/m²
High ceiling of 5m ~ 7m for maximum utilisation of storage space
Knock-out panel between 1st storey showroom and 2nd storey warehouse for future provision of internal staircases
2 private toilets within each warehouse unit at upper storeys
Fire alarm and sprinkler systems
24-hour building security system with CCTV
Emergency generator for essential services

Specification
Structure  
Raft foundation with RC Frame
External

- Sprayed textured coating on wall
- Anodised aluminium framewindows with tinted glass

Internal  
Floor Finishes
- Homogenous ceramic tiles to Passenger Lift Lobbies/Toilets
- Concrete floor to Showrooms (at 1st storey)/Warehouse Units/Goods Lift Lobbies/Loading & Unloading Bays
- Cement screed to Staircases/Smoke Free Lobbies
Wall
- Polished homogenous tiles to Passenger Lift Lobbies
- Concrete plaster with emulsion paint to Showrooms (at 1st storey)/Warehouse Units/Goods Lift Lobbies/Loading & Unloading Bays/Smoke Free Lobbies/Staircases
- Exposed metal grid to Toilets
Ceiling
- Plaster ceiling to Passenger Lift Lobbies
- Exposed grid to Good Lift Lobbies at upper storeys
- Plaster with emulsion paint to Showrooms (at 1st storey)/Warehouse Units/Goods Lift Lobbies/Loading & Unloading Bays/Smoke Free Lobbies/Staircases
- Exposed metal grid to Toilets
M&E Services   
Electrical Services
- Electrical supply for each unit is 60 Amp 3-phase except for #01-03 which is 80 Amp 3-phase
- Individual Distribution Board provided in each unit
- One (1) standby generator for essential services in times of power failure
Lightings
- Recessed downlights for Passenger Lift Lobbies
- Recessed fluorescent light fittings for Corridors/Toilets/Upper storey Goods Lift Lobbies
- Low bay discharge light fittings for Loading & Unloading Bays/1st storey Goods Lift Lobbies
Security & Telecommunication
- CATV system in electrical riser with cable trays provided to each unit for tapping off
- CCTV system will be installed at all Goods Lift Lobbies, entrances and perimeter of the building for enhanced security
-Ample telephone points at telecom riser with cable trays provided to each unit for tapping off
Fire Protection System
- Extra High Hazard Group Fire Sprinklers and Automatic/Manual Fire Alarm System complemented with Fire Hydrants, Dry Risers & Hosereel Systems designed in accordance with the relevant Code of Practice
Air-conditioning & Mechanical Ventilation System
- VRV Airconditioning System is provided to Passenger Lift Lobbies
- Natural ventilation to warehouse units with provision of louvres at external wall for future installation of airconditioning systems
- Mechanical ventilation is provided for basement carpark and toilets
Lighting Protection System
- Provided in accordance with Singapore Standard CP33:1985
 

Contact
For more information, kindly contact
Garrick Ong Handphone: 9819 6646
  email: garrick.ong@orangetee.com